top of page
Manchester
Wythenshawe,
manchester
A large project lasting four months. The property's old central heating system and electrical wiring are no longer functional, along with the damaged wall structure and old peeling wallpaper, we need to plaster the entire property, strengthen the structure, re-wire, and re-install the central heating system . After completing the above projects, the value of EPC and the property has been greatly enhanced. We also installed beautiful cabinets, floor tiles, and renovated bathrooms for the property.
10 / 03 / 2023
bottom of page